Wednesday, 5 February 2014

Editing: DAY 5

After we perfected each sound clip we added in a wild track which we filmed on shoot day in the basement. There was a lot of talking over the track so we edited it quite a lot but then it worked well. After we put the wild track on we listened to it again we heard a phone buzzing in the zip track so we had to take it out and put another zip track in that we had filmed. 
After we finished the diagetic sound we added in some music to crate a more mysterious atmosphere. We listened to about 10 tracks some of which definately wouldn't have fitted but then I found a track that sounded fine and would fit but didn't sound brilliant. In order to perfect this I slowed down the music and it worked very well. Then we faded the sound in and also added in some higher notes so it wasn't a bore to listen to. After this session all the sound was perfected. 



No comments:

Post a Comment